The first park features a capability of two hundred MW when Sandrini II contains a potential of 100 MW. The total cost of the two jobs were not disclosed however, throughout construction, about 200 staff were utilized. The projects are anticipated to view A few positions opening up for long https://solarcompaniesfresno.art.blog/