The 25mm thick large steel tube is pushed While using the conclusion closed by a steel shoe. On reaching the needed driving resistance, an entire length cage is decreased in to the tube and full of high slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://cast-in-situ-piles-in-ban11111.theblogfairy.com/31848679/new-step-by-step-map-for-cast-in-situ-piles