But How about the heat introduced for the duration of clinker cooling or the drying procedures? Marketplace stories estimate that just about forty% of all Electrical power inputs in cement production are wasted as a result of heat reduction, principally via outdated cooling techniques and inadequately insulated kilns. With AI https://purethermal.co.uk/media-news/november-launch-waste-heat-recycling-design-support-service-from-pure-thermal-and-oilon/